ARCHITECT | ENGINEER | CONSTRUCTION BID. How do I estimating yield and value from labor and equipment, for a Construction Project
Tax for Construction Contractors
Tax for Construction Contractors: Tax for Construction Contractors – Calculate Man Hours – Overview of the type of taxes that aply to tenders in the construction sector.
ARCHITECT | ENGINEER | CONSTRUCTION BID
Construction Project
In the fields of architecture and civil engineering, Construction is a process that comprises the construction of a building or assembling of infrastructure. Far from being a solitary activity, large-scale construction is a triumph of human multitasking. Normally, the project is managed by a project manager and supervised by a construction manager, design engineer, building developer, or project engineer.
Types of construction projects
In general, there are four types of construction:
Residential Building construction
Industrial construction
Commercial Building construction
Heavy Civil construction
Each type of construction project requires a unique team to plan, design, construct, and maintain the project.
Procurement
Procurement describes the merging of activities undertaken by the client to obtain a building. There are many methods of construction procurement; however, the three most common types of procurement are:
Traditional (Design-bid-build)
Design and build
Traditional
This is the most common method of construction procurement and is well established and recognized. In this arrangement, the architect or engineer acts as the project coordinator. His or her role is to design the works, prepare the specifications and produce construction drawings, administer the contract, tender the works, and manage the works from inception to completion. There are direct contractual links between the architect's client and the main contractor. Any subcontractor will have a direct contractual relationship with the main contractor.
Design and build
This approach has become more common in recent years and involves the client contracting a single entity to both provide design and to build that design. Sometimes, the Design and Build (D & B) package can also include finding the site, arranging to fund and applying for all necessary statutory consents.
The owner produces a list of requirements for a project, giving an overall view of the project's goals. Several D & B contractors present different ideas about how to accomplish these goals. The owner selects the ideas he or she likes best and hires the appropriate contractor.
CONSTRUCTION BID
CONSTRUCTION BID
Preparation of optimal Construction bids is the most critical step to execute an Engineering Project. Here, we will discuss, how to make- step by step-Construction bid
* If we make mistakes at the preparation of bids on Construction Project and tender have an extremely low price, be able to produce the collapse of Construction Firm and/ or loss of the Customer
* At else, if we make mistakes at the preparation of a bid on Construction Project and we presenting a price too high, we can make a reduction in the business relationship with the client
the conclusion is that we need review the proposal exhaustively
The staff that will make an offer on Construction Project must include the issue skill
* They must have connections with business and financial management of his Company
With respect to the actions to do to make a proposal on Construction Project, it is recommended that:
* Is required to see all details received in advance to Construction Project visit
* We will review during this visit all the aspects that will affect the performance of the resources that we will use in the Construction Project. For an example, :
- Availability of staff, infrastructure, and types of entry at the vicinity of the future Construction
- The commitment of the Work with Plant in Service or if this Construction work will be executed in an isolated place
- Influence of Trade Unions in the Area
- Places for the location of infrastructure, materials, and equipment
- Quality of an initial Engineering
- Features of Local weather
-The difficulty for accessing to Plant and times needed for prepares the act permits
So each preparation of a bid for Construction Project will require analysis of these and other situations ... Hence, for this task, we will require workers with excellent analytical skills, with experience in the disciplines that we offer and hourly availability that this kind of work needs
STUDY AND EVALUATION OF OFFERS, we will post at the followings Blogs
Evaluation of the direct cost of a bid for Construction Project
Financial Cost
Service cost of Insurance
Overhead cost
Cost Engineering
Fast estimates Construction Costs
Benefits
Taxes
Subscribe to: